Well Construction Interval Table

<< Click to Display Table of Contents >>

Navigation:  Table Descriptions > Group 1 >

Well Construction Interval Table

Previous pageReturn to chapter overviewNext page

Name

Well Construction Interval

Short Name

WINT

ERPIMS Supplied

Yes

Number of Fields

11

Total Record Length

317

Child Tables

 

Description of each well interval.

This table stores the depths at which the various components of a well begin and end.  It is designed to contain a record for every segment of a well. The captured intervals include screens, seals, grout, blank casing, etc. ERPToolsX will not include WCI or WMI data in a submission unless there is WINT information that references the well or well segment.  A screened interval is defined as the area above the bottom of the screen segment up to the bottom of the next screen segment (or to the ground surface for the top screened interval).  A described interval is an interval that has a corresponding WINT record.

 

Short Field Name

Import Required?

Delivery Required

Start

End

AFIID

Yes

C

1

5

LOCID

Yes

Y

7

21

IBDEPTH

Yes

Y

23

32

IEDEPTH

Yes

Y

34

43

CLASS

Yes

V

45

49

SCRNO

Yes

Y

51

51

MATERIAL

No

V

53

55

SDIAM

No

C

57

62

SOUA

No

C

64

69

PCTOPEN

No

C

71

76

REMARKS

No

N

78

317