<< Click to Display Table of Contents >> Beginning Time Field |
|
Description: Beginning Time is the starting time of the pumping or remedial performance interval being reported. PUMPINT: This is the starting time of the pumping interval being described. RSP: This is the beginning time of the interval for which cumulative remedial system performance parameters are being reported. RTP: This is the beginning time of the interval for which cumulative remedial technology performance parameters are being reported.
|
Project Format |
Tables Located |
Import Required? |
Delivery Required |
Start |
End |
Prime |
Yes |
35 |
38 |
All photos contained in this online document are linked to full sided images of the imbedded image. Simply click on the image to have a browser view the image in its full size.